Revamping of Partial Separator of Metal Joint

Date:2019-09-15 Browse:1
Core tips:The temporary support pipe of the pushing trabecula should be removed before welding the steel joint connecting steel pl
The temporary support pipe of the pushing trabecula should be removed before welding the steel joint connecting steel plate. When the temporary support is removed, the external force on the pushing trabecula will change, which may lead to uncontrollable displacement of the pushing trabecula, and the water-stop rubber may be destroyed. The consequence is the failure of water-stop in the chamber, which is disastrous for the immersed tunnel. In order to ensure that this will not happen, we first reinforce the structure before removing the pushing trabecular steel tube. In the narrow space, if the new structure is strengthened, it will increase the difficulty of welding and make the welding quality more difficult to control. The most reliable scheme is to transform the existing structure.
The steel joint structure is composed of connecting钢板和分区。一些partitions are reformed. The partitions are changed into pure "I" type structure (removing the original small stiffeners). The upper flange plate is outer ring connecting steel plate, the web plate is partition plate, the lower flange plate is inner ring connecting steel plate, and a cushion plate is added at the top of the upper flange.
For the whole circle of steel joints, the partition we reconstructed involves four parts of the top wall area, two parts of the side wall area and seven parts of the bottom wall area. The partition structure of the reconstructed partition was welded before the temporary bracing pipe was demolished (or partially demolished) to reinforce the pushing trabecular, so as to avoid the failure of water stop in the combined chamber.
Hot Products China Products China Manufacturers/Suppliers Wholesale Products Wholesale Price Continent Channel Product Index
Focus Technology: www.omustang.com m.www.omustang.com